Compliance & safety · UK hospitality teams

Less chasing paperwork.
More confidence when inspectors visit.

Keep checks, certificates, procedures and follow-up work in one place. Your team can see what needs attention — and find the relevant records when someone asks.

How Angel Hub helps

Stay on top of the work.
Keep the record with it.

For the manager juggling today’s shift, tomorrow’s service visit and a new starter’s training. Four ways to make the day easier.

See what needs attention

See which checks and renewals are due soon or overdue. Keep certificate dates and the person responsible together, so your team knows what needs doing.

Find the record when you need it

Look back at signed-off checks and open the certificates and service reports you’ve saved. Less hunting through folders, inboxes and someone else’s notebook.

Give a fault a next step

Raise a task from a failed check, assign the work and follow its progress. The issue has a next step your team can see.

Keep know-how in the business

Give staff a shared place for procedures and instructions. Keep training records and safety-document acknowledgements available as people join or change roles.

When an inspector visits

Know where to look.
Show what’s been done.

A fire officer at reception. An environmental health officer in the kitchen. The right records make the conversation easier.

These examples show how Angel Hub can help you prepare. Inspectors also look at your premises and how people work.

Choose a visit to see an example

Fire safety visit

Have the records ready to discuss

Find your fire risk assessment, signed-off checks and saved service certificates. Show what your team has recorded and which follow-up jobs still need attention.

Useful records: fire alarm tests, emergency lighting checks, fire training.

Explore fire safety guidance
Food hygiene / EHO visit

Show how kitchen routines are recorded

Bring up recorded temperatures, completed cleaning checks and your food safety procedures. Look back at the checks your team has signed off.

Useful records: fridge temperatures, cleaning checks, food safety procedures.

Explore food safety guidance
Health & safety visit

Explain what happened after an issue

Keep risk assessments, equipment service records and follow-up tasks in the same app, so you can explain what was found and what happened next.

Useful records: risk assessments, servicing, staff training, corrective work.

Explore health & safety guidance

The reference library · England

Find the guidance for your next job.

Common checks and records for hotels, restaurants and pubs in England: what’s expected, how often, and how Angel Hub can help you organise the work. Choose a topic below, then open a guide for the detail and sources.

Requirements depend on your premises and risks. Rules differ across the UK; businesses in Wales, Scotland and Northern Ireland should check their own regulator’s guidance.

Law a legal requirement · Guidance official guidance or a British Standard — we mark the difference honestly.

35 requirements across 7 areas — every one with its own step-by-step guide below.

Fire safety7 requirements
RequirementHow oftenHow Angel Hub helps
Fire risk assessmentA suitable and sufficient FRA, recorded in full since Oct 2023 whatever your sizeRead the guide Review regularly and on material change Law, no fixed interval; as often as your assessor advises, annually in small, simple premises Guidance
  • The FRA as a signed document with a review countdown
Fire alarm — test & serviceKeep the system in working order; test one call point weekly in rotation, loggedRead the guide Maintain in working order Law, no fixed interval; weekly test Guidance; service at most 6-monthly Guidance
  • A checklist that repeats itself
  • The service certificate on the renewal clock
Emergency lightingKeep escape lighting working; short monthly test of every fitting, annual full-duration testRead the guide Provide and keep working Law, no fixed interval; monthly + annual Guidance
  • Monthly checklist
  • The annual test certificate with its due date
Fire extinguishersKeep extinguishers in place, unobstructed and in orderRead the guide Provide and maintain the equipment Law, no fixed interval; monthly visual Guidance; annual service Guidance
  • A walk-round checklist
  • Every extinguisher on the equipment register
Fire doorsKeep fire doors closing and intact (the 2022 quarterly-check rules apply to blocks of flats, not hotels)Read the guide Maintain in working order Law, no fixed interval; daily glance, monthly closer check, 6-monthly inspection Guidance
  • Checklist items
  • The inspection on the renewal clock
Fire drills & staff trainingTrain everyone at induction and periodically; drill at least annually, varied and recordedRead the guide Training at induction and periodically Law, no fixed interval; drills at least annually, refresher intervals per your FRA Guidance
  • Per-staff training renewals
  • A drill record that files itself
Martyn's LawFrom expected spring 2027 (200+ people present): notify the SIA and have four protection proceduresRead the guide One-off notification + keep procedures current Law, not yet in force
  • The four procedures as signed documents, ready before commencement
Building & plant6 requirements
RequirementHow oftenHow Angel Hub helps
AsbestosEvery non-domestic building, most likely if built before 2000: find it or presume it, keep a register, and prepare and follow a written management planRead the guide Assess, record and plan Law, no fixed interval; plan review every 12 months or on change Guidance
  • The plan as a document
  • The review date on the renewal clock
Lifts (LOLER)Thorough examination by a competent person, reports keptRead the guide 6-monthly passenger, 12-monthly goods-only, or per a written examination scheme Law
  • Each lift on the register with its examination counting down
Pressure systemsWritten scheme of examination before use — your espresso machine countsRead the guide Written scheme before use, then examine per the scheme Law, no fixed interval; the competent person advises how often Guidance
  • Steam appliances on the register
  • Exam dates on the clock
Air conditioning — TM44 + F-gasTM44 inspection if over 12kW; refrigerant leak checks by charge, records kept 5 yearsRead the guide TM44 5-yearly Law; leak checks annual / 6-monthly / quarterly by charge Law
  • Plant on the register
  • Both renewal records
Kitchen extract — TR19Grease cleaning to your usage band — most insurers make it a policy conditionRead the guide Keep the system safe under your fire risk assessment Law, no fixed interval; quarterly / 6-monthly / annual by cooking hours Guidance
  • The cleaning verification report on the renewal clock
  • Your contractor's docs
Gas safetyGas Safe engineers only; guest and staff accommodation gets the legal 12-monthly checkRead the guide Annual kitchen check Guidance; 12-monthly accommodation checks Law
  • Both certificates on the renewal clock
  • The engineer's registration on file
Water & legionella5 requirements
RequirementHow oftenHow Angel Hub helps
Legionella risk assessmentAssessment by a competent person; there is NO fixed "every 2 years" rule — review regularly, and straight away if it may no longer be validRead the guide Review regularly and on change Law, no fixed interval
  • The assessment as a signed document
  • A review record
Legionella routine monitoringMonthly temperatures, weekly flushing of unused outlets, quarterly showerhead descale, annual inspectionsRead the guide Maintain and monitor your controls Law, no fixed interval; monthly / weekly / quarterly / annual Guidance
  • Three checklists that repeat themselves
  • The annual inspections on the clock
Spa pools & hot tubsWater checks several times a day, monthly microbiological tests, quarterly legionella samplesRead the guide Control and monitor the risk Law, no fixed interval; daily through quarterly Guidance
  • A daily checklist
  • Sampling records via your contractor
Private water suppliesBorehole or spring: the local authority risk-assesses and samples; you cooperate, remedy, and keep any disinfection workingRead the guide 5-yearly risk assessment; sampling by volume Law; keep any disinfection working Law, no fixed interval
  • Every LA visit and fix on record
Mains drinking waterThe water company's duty ends where water leaves its pipes; your pipes and fittings are yours to keep in repair — there's no routine test for you to buyRead the guide Keep pipes and fittings in repair and stop backflow Law, no fixed interval; nothing routine to test
  • Nothing to schedule — and we say so
Electrical2 requirements
RequirementHow oftenHow Angel Hub helps
Fixed wiring — EICRKeep the installation safe — no fixed interval in law, except rooms let to staff as their homeRead the guide Maintain to prevent danger Law, no fixed interval; EICR at most 5-yearly, pools yearly Guidance; rented staff rooms 5-yearly or sooner Law
  • The latest EICR on the renewal clock, with a shorter cycle where needed
Portable appliances — PATKeep appliances safe; annual PAT is NOT the lawRead the guide Maintain to prevent danger Law, no fixed interval; earthed kit checked 6–12-monthly, tested 1–2-yearly, the short end in kitchens and laundries Guidance
  • Per-appliance test status on the equipment register
Food safety4 requirements
RequirementHow oftenHow Angel Hub helps
Food safety management + daily checksA documented HACCP-based system; chill at 8°C or below, hot holding at 63°C or aboveRead the guide Run and monitor it, review on any change Law, no fixed interval; temperature limits Law; daily checks Guidance
  • Opening and closing checklists that repeat themselves, readings logged
Food business registrationRegister with the local authority before trading; re-register on change of operator or premisesRead the guide Once per premises + on change Law
  • One record with the change triggers noted
Hygiene rating displayDisplaying the sticker is voluntary in England and encouraged — you may have heard otherwise, because it IS law in Wales and Northern IrelandRead the guide New rating at each inspection; display encouraged Guidance
  • Your rating and inspection date on record
Allergens — Natasha's Law + FIRName and full ingredients, allergens emphasised, on food packed on site before it's ordered; allergen information for every dish, clearly signpostedRead the guide Accurate at all times, so update it when a dish changes Law, no fixed interval; check it daily Guidance
  • An allergen sheet per dish in the knowledge base, with the 14 statutory allergens as one-tap labels
  • An allergen tag on the food items you buy
  • Per-staff training records
Health & safety, people6 requirements
RequirementHow oftenHow Angel Hub helps
H&S risk assessments, policy, posterSuitable and sufficient assessments, with the findings and an H&S policy written down at 5+ staff; the law poster displayed, or the leaflet givenRead the guide Review assessments when no longer valid or after significant change, and revise the policy as often as appropriate Law, no fixed interval
  • Signed assessments with review dates in one place
Employers' liability insuranceAt least £5m cover; certificate where staff can see itRead the guide Cover in force every day you employ staff Law; renew before the policy ends
  • The renewal on the clock with the certificate attached
RIDDOR reportingWork-related accidents that kill anyone, give a worker a specified or over-7-day injury, or send a guest or visitor from the scene to hospital for treatment; dangerous occurrencesRead the guide Without delay / 10 days / 15 days by type Law
  • An incident log with a RIDDOR flag built in
First aidAdequate and appropriate kit, facilities and trained peopleRead the guide Keep provision adequate and appropriate Law, no fixed interval; check kits frequently and restock after use, certificates valid 3 years Guidance
  • A kit checklist
  • First-aider renewals that show "Due soon"
COSHH — chemicalsAssess hazardous substances before use — recorded at 5+ staff; inform and train staffRead the guide Review regularly and on change Law, no fixed interval
  • COSHH assessments with sign-offs and review cycles
Accident bookEntries kept at least 3 years, stored so personal details stay privateRead the guide Every staff injury, with 10+ staff on site Law; reportable incidents and over-3-day injuries, any size Law; recording every accident is good practice
  • A digital incident log that keeps entries three years and out of other staff's view
Premises admin & licences5 requirements
RequirementHow oftenHow Angel Hub helps
Business waste + Simpler RecyclingRegistered carriers, transfer notes kept 2 years; separate recycling and food waste at 10+ FTE across the business, every size from 31 March 2027Read the guide Separate every collection; a note per collection or one for a regular series Law, up to a year Guidance
  • Carrier and note records
  • Segregation spot-checks
Data protection — ICO feeAnnual fee (CCTV puts nearly every hotel in scope); privacy notices, and CCTV signs as the ICO recommendsRead the guide Annual fee Law; privacy notices kept current Law, no fixed interval; CCTV signs Guidance
  • The renewal on the clock with your tier noted
Alcohol — premises licenceAnnual fee on the grant anniversary — non-payment SUSPENDS the licence; DPS + mandatory conditionsRead the guide Annual fee Law; DPS and conditions standing Law
  • The highest-value reminder on the renewal clock
Music licenceAudible music, radio or TV anywhere on site needs the copyright owners' permission, usually TheMusicLicenceRead the guide Standing Law; the licence renews yearly
  • The renewal on the clock
Weights & measures at the barFixed spirit, wine and beer measures, the required notices, stamped or CE/UKCA-marked equipmentRead the guide Standing Law
  • The bar SOP on file
  • Equipment verification on record

The guides

Turn the guidance into a routine.

Open a guide for the requirement, its sources and practical steps in Angel Hub. Adapt the suggested checks to your premises, your risk assessments and the advice of your competent specialists.

Fire safety7 guides

Get your fire risk assessment recorded and reviewed

What’s expected — The law requires a suitable and sufficient fire risk assessment, and since 1 October 2023 it must be recorded in full — findings, arrangements, who helped make it, and your contact details — whatever the size of your business. Article 9 of the Fire Safety Order says review it "regularly so as to keep it up to date", and particularly if there is reason to suspect it is no longer valid or something has significantly changed; it fixes no interval. Official guidance says your fire risk assessor should advise how often, and recognises an annual review as good practice for small, simple premises. Sources: legislation.gov.uk, Fire Safety Order 2005, article 9 · gov.uk, fire safety responsibilities under s.156 · gov.uk, a guide for persons with duties under fire safety legislation.

Set it up in Angel Hub

  1. Open Safety → New document and file the fire risk assessment with its review cycle and the responsible person's sign-off.
  2. Open Compliance → Add record with the review due date, so the countdown is always visible.
  3. Turn every action the assessment raises into a task — owner and deadline on each.

From now on the assessment, its sign-off and its next review date live in one place, the review counts down in Compliance, and the actions can't quietly evaporate.

What to put in it

The assessment document's sections:

  • Who made it, and who helped
  • Findings: the fire hazards, and the people at risk
  • The arrangements in place — alarm, emergency lighting, extinguishers, fire doors, training (each has its own guide and its own running routine)
  • Actions arising, each with an owner and a date
  • Review date, and what would trigger an earlier review

Who and how often — the responsible person; review regularly — as often as your fire risk assessor advises — and after any material change.

Why it matters — since October 2023, "we assessed it but didn't write it all down" no longer holds; the recorded assessment is the first document a fire officer reads.

Back to the chart ↑

Stay on top of weekly fire alarm tests

What’s expected — Fire law says your alarm system must be kept in working order: article 17 of the Fire Safety Order requires a suitable system of maintenance, and it fixes no test frequency. The British Standard (BS 5839-1) recommends testing one manual call point every week — a different one each time, so every call point gets tested in rotation — and keeping a log; it also recommends a competent-person service at least every six months. Sources: legislation.gov.uk, Fire Safety Order 2005, article 17 · BSI, BS 5839-1.

Set it up in Angel Hub

  1. Open Checklists → New checklist template.
  2. Name it Weekly fire alarm test. New templates are already set to repeat weekly, so there's nothing to configure.
  3. Add the items below, assign it to your maintenance team, and save.
  4. Open Compliance → Add record for the alarm service: your engineer's last visit, the certificate attached, and the next service due six months on. Link your alarm contractor from Contractors.

That's it — the checklist now appears every week by itself, each completed test is logged with who did it and when, a missed week shows up immediately, and the service renewal counts down in Compliance.

What to put in it

  • Pick this week's call point (rotate — note its location)
  • Warn reception and staff before testing
  • Activate the call point
  • Check the panel shows the alert and the sounders operate
  • Reset the panel
  • Record which call point was tested and the result
  • Any fault → raise it as a call-out straight away (two taps from the checklist)

Who and how often — weekly; maintenance or the duty manager.

Why it matters — the test log is what a fire officer will ask to see, and a dead call point found on a Tuesday test is a repair, not a tragedy.

Back to the chart ↑

Keep emergency lighting tested every month

What’s expected — Fire law says emergency lighting must be provided and kept working — article 14 of the Fire Safety Order requires escape routes and exits needing illumination to have "emergency lighting of adequate intensity" if the normal lighting fails; it fixes no test frequency. The British Standard (BS 5266-1) recommends a short monthly "flick" test of every emergency light and exit sign, plus a full rated-duration test once a year (typically three hours), both logged — and a daily glance at the indicator panel if you have a central battery system. Sources: legislation.gov.uk, Fire Safety Order 2005, article 14 · BSI, BS 5266-1.

Set it up in Angel Hub

  1. Open Checklists → New checklist template.
  2. Name it Monthly emergency lighting test and change the frequency to monthly.
  3. Add the items below and assign it to maintenance.
  4. Open Compliance → Add record for the annual full-duration test: last test date, certificate attached, next one due in a year.
  5. If you have a central battery system, add "glance at the battery indicator panel" to your existing daily opening checklist.

From now on the flick test appears on the first of every month by itself, every fitting checked is logged, and the annual test counts down in Compliance.

What to put in it

  • Work through every area against your fitting list (keep the list in the checklist notes)
  • Flick-test each emergency light — does it come on?
  • Check every exit sign illuminates and is clean and undamaged
  • Note any fitting that stayed dark or looked dim
  • Any failure → raise a task or call-out on the spot (two taps from the checklist)
  • Record areas covered and results

Who and how often — monthly; maintenance. Annual full-duration test by a competent person.

Why it matters — the lighting log shows a fire officer your escape routes stay lit in a power cut, and a dead fitting found in a monthly test is a replacement order, not a dark stairwell.

Back to the chart ↑

Walk your fire extinguishers once a month

What’s expected — Fire law says fire-fighting equipment must be provided and maintained: article 13 of the Fire Safety Order requires premises to be equipped with appropriate fire-fighting equipment, "easily accessible, simple to use and indicated by signs", and article 17 requires it to be maintained. Neither fixes a service interval. The British Standard (BS 5306-3) recommends a monthly visual check by your own team, an annual basic service by a competent person, an extended service at year five (then five-yearly) for water, foam and powder types, and a ten-year overhaul for CO₂. Sources: legislation.gov.uk, Fire Safety Order 2005, article 13 · BAFE, extinguisher servicing.

Set it up in Angel Hub

  1. Open Assets → Add asset for each extinguisher: its location, type, and its annual service schedule. (Prefer one date for the whole site? A single Compliance record for the annual service works too.)
  2. Open Checklists → New checklist template, name it Monthly extinguisher walk-round, and change the frequency to monthly.
  3. Add the items below and assign it to the duty manager or maintenance.

From now on the walk-round appears every month by itself, each extinguisher's service history builds up on its own asset, and an overdue service is visible before your engineer's reminder letter arrives.

What to put in it

For each extinguisher on the walk:

  • In its proper place and unobstructed
  • Pin and tamper seal intact
  • Pressure gauge reading in the green
  • No corrosion, dents or damage
  • Signage present and visible
  • Anything missing, discharged or damaged → task or call-out in two taps
  • Confirm the count matches your register

Who and how often — monthly; duty manager or maintenance. Annual service by a competent person.

Why it matters — your insurer and the fire officer both expect the monthly check, and a missing extinguisher is far better found on a walk-round than during a fire.

Back to the chart ↑

Keep fire doors doing their job

What’s expected — Fire law says fire doors must be maintained: article 17 of the Fire Safety Order requires a suitable system of maintenance, keeping them in an efficient state, in efficient working order and in good repair. It fixes no frequency for hotels. (The 2022 regulations with quarterly fire-door checks apply to buildings with two or more flats — not hotels.) Guidance for hotels: a daily check that escape-route doors close fully, a monthly check of self-closers and seals, and a six-monthly inspection by a competent person. Sources: legislation.gov.uk, Fire Safety Order 2005, article 17 · gov.uk, Fire Safety (England) Regulations 2022.

Set it up in Angel Hub

  1. Add two items to your existing daily opening checklist: escape-route doors close fully, and nothing is wedged open.
  2. Open Checklists → New checklist template, name it Monthly fire door check, set the frequency to monthly, and add the items below.
  3. Open Compliance → Add record for the six-monthly competent-person inspection, report attached, next one counting down. Link the contractor from Contractors.

From now on the daily glance is part of opening, the monthly check appears by itself, and the inspection can't be forgotten.

What to put in it

The monthly check, door by door:

  • Door closes fully from any angle, on its own
  • Self-closer works and isn't leaking
  • Seals intact all round
  • No new gaps, damage or missing signage
  • Hinges firm
  • Any fault → task or call-out in two taps

Who and how often — daily glance by the opening team; monthly check by maintenance; six-monthly inspection by a competent person.

Why it matters — a wedged-open fire door is the single most common finding on a fire inspection, and the log shows yours are checked, not assumed.

Back to the chart ↑

Put fire drills and refreshers on the rota

What’s expected — The law requires adequate fire training at induction, whenever someone's risks change, and repeated periodically where appropriate: article 21 of the Fire Safety Order fixes no interval. Official guidance for sleeping accommodation: refreshers at set intervals, and drills at least annually or as your fire risk assessment determines — varying the escape routes, with a debrief, all recorded. Sources: legislation.gov.uk, Fire Safety Order 2005, article 21 · gov.uk, fire safety risk assessment — sleeping accommodation.

Set it up in Angel Hub

  1. In Training, create Fire safety training with New course and set its refresher period. Record every staff member's completion — the Training records view shows who's current, Due soon or Expired.
  2. Open Checklists → New checklist template, name it Fire drill, set the frequency to annual (or whatever your FRA says), and add the items below.
  3. Debrief actions go straight into tasks with owners.

From now on the drill schedules itself, every drill is recorded with who took part, and an untrained new starter is visible in Training the day they join.

What to put in it

The drill record:

  • Date, time, and the scenario
  • Which escape routes were used (vary them — note last time's)
  • Evacuation time
  • Who took part
  • What went well, what didn't
  • Debrief actions → tasks with owners
  • Note for next drill's variation

Who and how often — drills at least annually (or as the FRA determines); training at induction and at your set refresher intervals.

Why it matters — the drill record proves everyone would know what to do at 3am, not just that a bell was rung once.

Back to the chart ↑

Get ready for Martyn's Law

What’s expected — A new terrorism-protection law is expected to commence in spring 2027. If 200–799 people (staff included) could reasonably be present — most mid-size hotels — you'll need to notify the SIA of your responsible person and have public-protection procedures: evacuation, invacuation, lockdown and communication. No physical measures are mandated at this tier; 800+ adds documented measures. It's law, but not yet in force — final guidance is due autumn 2026. Source: gov.uk, understanding Martyn's Law.

Set it up in Angel Hub

  1. Open Safety → New document for each of the four procedures: evacuation, invacuation (moving people inside), lockdown, and communication.
  2. Sign each one off and set a review cycle, so they stay current as staff change.
  3. When SIA notification opens, add it as a Compliance record so the one-off duty is on the clock.

From now on the four procedures exist, signed and reviewable — written calmly this year instead of scrambled at commencement.

What to put in it

Each procedure, one page, plain words:

  • Evacuation: who decides, the routes, who sweeps, where everyone goes
  • Invacuation: when it's safer to bring people in, and where
  • Lockdown: how doors are secured, who does what
  • Communication: how staff are alerted and guests are told, by whom

Who and how often — the responsible person; in place from commencement (expected spring 2027), reviewed as staff and layout change.

Why it matters — four short procedures written in an afternoon now beat a compliance panic in 2027 — and they're simply good practice regardless.

Back to the chart ↑

Building & plant6 guides

Keep your asbestos plan alive

What’s expected — Regulation 4 of the Control of Asbestos Regulations puts a duty to manage asbestos on every non-domestic building, whatever its age — you must assess whether asbestos is or is liable to be present, presume it does unless there is strong evidence otherwise, record the conclusions, keep an up-to-date register of where it is and its condition, and prepare and follow a written management plan. In practice it is a pre-2000 building you should expect to find it in, but the duty to look and to record what you found is not limited to those. The plan must be reviewed "at regular intervals" and without delay if it may no longer be valid; no interval is fixed, and HSE guidance says every 12 months or on change, with a refurbishment survey before any intrusive work. Sources: legislation.gov.uk, Control of Asbestos Regulations 2012, regulation 4 · HSE, duty to manage asbestos.

Set it up in Angel Hub

  1. Open Safety → New document and file the management plan with the survey's register of locations and conditions, signed off.
  2. Open Compliance → Add record for the survey and the annual plan review, so the review date counts down.
  3. Make "check the asbestos register first" a standing step on any refurbishment or maintenance project.

From now on the plan has a visible review date, and no contractor starts drilling before the register has been looked at.

What to put in it

  • The register: where asbestos is (or is presumed), and its condition
  • Who manages it day to day
  • How and when condition is re-checked
  • How contractors are shown the register before any work
  • Review date

Who and how often — whoever controls maintenance; plan review every 12 months or on change (guidance).

Why it matters — exposures happen when someone drills before checking the register; the plan on record is what shows you manage it, not just filed it.

Back to the chart ↑

Keep lift examinations on the clock

What’s expected — The law requires a thorough examination of any lift by a competent person: every 6 months for passenger lifts, every 12 for goods-only lifts (or per a written examination scheme), plus after substantial change — with reports kept. Routine maintenance is a separate legal duty with no fixed frequency. Sources: legislation.gov.uk, LOLER 1998, regulation 9 · HSE, INDG339.

Set it up in Angel Hub

  1. Open Assets → Add asset for each lift, with its maintenance schedule and your lift company linked from Contractors.
  2. Open Compliance → Add record per lift for the thorough examination: report attached, next one due in 6 (or 12) months.
  3. Anything the report flags → call-out in two taps.

From now on each lift's examination counts down in Compliance, its service history builds on the asset, and a defect becomes a job the day the report lands.

What to put in it

Each examination record:

  • Lift identity and location
  • Examination date and the competent person / insurer
  • The report file, attached
  • Defects noted → call-outs
  • Next examination due

Who and how often — 6-monthly (passenger) or 12-monthly (goods-only) by a competent person; maintenance ongoing.

Why it matters — an out-of-date examination takes the lift out of service; the countdown means the engineer is booked before the deadline, not after.

Back to the chart ↑

Put your espresso machine on the register (yes, really)

What’s expected — The law covers any system containing steam at any pressure — which includes commercial espresso machines and steam ovens, not just boilers. Regulation 8 is blunt about it: you "shall not operate the system or allow it to be operated" without a written scheme of examination drawn up or certified as suitable by a competent person. The scheme itself sets the nature and frequency of examination — the regulations fix no interval — and HSE's guidance says the competent person will normally advise on how often. Sources: legislation.gov.uk, Pressure Systems Safety Regulations 2000, regulation 8 · HSE, INDG178.

Set it up in Angel Hub

  1. Open Assets → Add asset for each steam appliance: espresso machine, steam oven, boiler.
  2. Open Compliance → Add record for the written scheme and each examination, certificates attached, next exam counting down.
  3. Link the competent person or contractor from Contractors.

From now on every steam appliance is on the register with its examination on the clock — including the one most hotels don't know is in scope.

What to put in it

  • The appliance list: espresso machine, steam ovens, boilers
  • The written scheme reference and who certified it
  • Each examination: date, result, certificate file
  • Next examination due

Who and how often — at the interval the scheme sets, which the competent person will normally advise on.

Why it matters — most hotels don't know the coffee machine is in scope; your insurer does.

Back to the chart ↑

Stay ahead of air-con inspections and leak checks

What’s expected — If your air conditioning totals more than 12kW under one control, the law requires a TM44 inspection by an accredited assessor at least every five years (there's a £300 penalty). F-gas law adds refrigerant leak checks by certified personnel at intervals set by charge: 5t CO₂e or more annually, 50t+ six-monthly, 500t+ quarterly — automatic leak detection doubles the intervals — with records kept five years. The two rules come from different places and have separate sources below: the air-conditioning guidance says in terms that F-gas leak checking is outside its remit. Sources: gov.uk, air conditioning inspections · gov.uk, checking F gas equipment for leaks.

Set it up in Angel Hub

  1. Open Assets → Add asset for the AC plant, noting each system's refrigerant charge — the charge decides your leak-check interval.
  2. Open Compliance → Add record for the TM44 inspection, report attached, due again in five years.
  3. Add a second record for the leak checks at your charge's interval, engineer's certification noted.

From now on both clocks run themselves — the five-year one nobody remembers, and the leak checks the F-gas inspector asks about.

What to put in it

  • Each system: location, kW, refrigerant type and charge
  • TM44: assessor, date, report file, due date
  • Leak checks: interval by charge, engineer and certification, results, kept five years

Who and how often — TM44 five-yearly; leak checks annually, six-monthly or quarterly by charge — certified personnel only.

Why it matters — the TM44 has a fixed penalty and a five-year memory no human calendar survives; the leak-check log is exactly what an F-gas inspector asks to see.

Back to the chart ↑

Keep kitchen extract cleaning on the calendar

What’s expected — No statute names TR19 — the legal duty is controlling fire risk under your fire risk assessment. But most insurers make TR19-compliant grease cleaning a policy condition, and skipping it routinely voids kitchen-fire claims. The guidance frequencies go by cooking hours: heavy use (12–16h/day) quarterly, moderate (6–12h) six-monthly, light (2–6h) annually — with a post-clean verification report as your evidence. Sources: legislation.gov.uk, Fire Safety Order 2005, article 9 · BESA, kitchen extract cleaning.

Set it up in Angel Hub

  1. Work out your usage band from daily cooking hours.
  2. Open Compliance → Add record for the extract clean: verification report attached, next clean due at your band's interval.
  3. Add your ventilation-hygiene contractor in Contractors, with their credentials and insurance on file.

From now on the clean books itself onto the clock at the right interval, and the verification report your insurer would ask for is one tap away.

What to put in it

  • Usage band and daily cooking hours (how the interval was chosen)
  • Date of each clean and the contractor
  • The post-clean verification report, attached
  • Next clean due

Who and how often — quarterly, six-monthly or annually by cooking hours; specialist contractor.

Why it matters — after a kitchen fire, the first document your insurer asks for is the cleaning verification report; "we wiped the canopy" doesn't count.

Back to the chart ↑

Keep gas safety certificates current

What’s expected — The law requires all gas work to be done by Gas Safe-registered engineers (with catering competences for commercial kitchens). For the kitchen itself no interval is fixed in law — HSE guidance calls annual a reasonable minimum, and the "CP42" catering certificate is the industry record, not a statutory document. But for guest bedrooms and staff accommodation the law does require 12-monthly safety checks with records kept: HSE lists hotels and B&Bs among the accommodation caught by the landlord duties in regulation 36, because those cover premises occupied for residential purposes under a lease or a licence. Its wording is worth knowing — you must arrange the annual check on "any gas appliances serving guest accommodation even if it is sited away from the guest accommodation", so a boiler in a plant room counts. Sources: HSE, gas safety checks — who needs them · HSE, CAIS23.

Set it up in Angel Hub

  1. Open Compliance → Add record for the annual kitchen gas check, certificate attached.
  2. Add a second record for the 12-monthly accommodation gas safety checks — this is the one the law requires.
  3. Add your engineer in Contractors, with their Gas Safe registration and catering competences on file.

From now on both certificates count down separately, and the engineer's own credentials are checked in the same place.

What to put in it

  • Kitchen check: appliances covered, engineer and Gas Safe number, date, certificate file, next due
  • Accommodation check: rooms/appliances covered, same details — kept as its own record
  • The engineer's registration and competences, in Contractors

Who and how often — kitchen annually (guidance); guest and staff accommodation every 12 months (law); Gas Safe engineers only.

Why it matters — the accommodation check is the one that's actually law, and the one that gets forgotten because everyone's watching the kitchen.

Back to the chart ↑

Water & legionella7 guides

Get your legionella register in one place

What’s expected — The law requires a legionella risk assessment of your water system by a competent person. There is no fixed "every two years" rule: neither the law nor HSE's current legionella book (L8, 2013 edition) sets an interval. What the law does require is a review regularly, and straight away whenever there's reason to think the assessment is no longer valid; HSE's guidance gives examples such as changes to the system or its use, checks showing the controls aren't working, and a case of legionnaires' disease. Your routine monitoring frequencies come from that assessment. Sources: legislation.gov.uk, COSHH Regulations 2002, regulation 6 · HSE, L8 Approved Code of Practice · HSE, legionella risk assessment.

Set it up in Angel Hub

  1. Open Safety → New document and file the legionella risk assessment with its review cycle and the responsible person's sign-off.
  2. Open Compliance → Add record for each dated event the guidance recommends: the annual calorifier internal inspection, the annual cold-water tank inspection (with its summer temperature check), and your water-treatment contractor's visits, certificates attached.
  3. Set up the three routine checks — each has its own guide: monthly temperatures, weekly flushing of unused outlets and the quarterly showerhead descale.
  4. Add your water-treatment contractor in Contractors, with their certificates and renewal dates.

From now on one place holds the assessment, the renewals counting down, and the routine checks logging themselves — the whole register, no lever-arch file.

What to put in it

The Compliance record for each event:

  • What it is (calorifier inspection, tank inspection, contractor visit)
  • Date done and who did it
  • The certificate or report file, attached
  • Next due date

The Safety document holds the assessment itself: who assessed, what was found, the monitoring scheme it sets, and what would trigger an early review.

Who and how often — you, as the employer or whoever controls the premises, make sure the assessment is done and reviewed — regularly rather than on a fixed clock, and straight away when anything significant changes; the responsible person you appoint runs the controls day to day.

Why it matters — after any legionella scare, an environmental health officer will want the assessment and the monitoring log; this way they're one screen, not a shelf.

Back to the chart ↑

Take your water temperatures every month

What’s expected — Controlling legionella is a legal duty; the monitoring frequencies are official guidance (HSE's HSG274 Part 2), tuned by your own risk assessment. It recommends monthly temperature checks: cold water below 20°C within two minutes at your sentinel outlets, and the calorifier flow at 60°C or above (as close to 60°C as practicable, never below) with its return at 50°C or more. For hot water: if it circulates, check monthly that each main loop's return leg is at 50°C or more, and quarterly that the last outlet on each smaller loop reaches 50°C within a minute; if it doesn't circulate, check monthly that the nearest and furthest outlets reach 50°C within a minute. Sources: legislation.gov.uk, COSHH Regulations 2002, regulation 7 · HSE, HSG274 Part 2.

Set it up in Angel Hub

  1. Open Checklists → New checklist template.
  2. Name it Monthly water temperatures and change the frequency to monthly.
  3. Add the items below — name each sentinel outlet from your risk assessment in its own item, so nothing gets skipped.
  4. Assign it to maintenance and save.

From now on it appears every month by itself, every reading is logged with who took it and when, and a missed month is visible at a glance.

What to put in it

  • At each hot sentinel point: the return leg of each main loop if your hot water circulates, otherwise the outlet run for one minute — 50°C or above? Record the reading
  • At each cold sentinel outlet: run for two minutes — below 20°C? Record the reading
  • Calorifier flow: 60°C or above (as close to 60°C as practicable, never below) — record
  • Calorifier return: 50°C or above — record
  • Any outlet out of range → task or call-out in two taps
  • Note anything unusual (unused areas, works in progress)

Who and how often — monthly; maintenance.

Why it matters — the temperature log shows an environmental health officer your controls are working, and a slowly cooling calorifier caught in month two is a repair, not an outbreak investigation.

Back to the chart ↑

Flush unused outlets every week

What’s expected — Official guidance (HSG274 Part 2) recommends flushing any outlet that hasn't been used for seven days or more — in a hotel, that means the taps and showers in unoccupied guest rooms — every week, so water never sits still in the pipes. The duty to control legionella is law; the weekly frequency is guidance, tuned by your risk assessment. Sources: legislation.gov.uk, COSHH Regulations 2002, regulation 7 · HSE, HSG274 Part 2.

Set it up in Angel Hub

  1. Open Checklists → New checklist template.
  2. Name it Weekly flush — unused rooms and outlets. New templates already repeat weekly, so there's nothing to configure.
  3. Add the items below and assign it to housekeeping or maintenance.

From now on it appears every week by itself, and the log shows exactly which rooms were flushed, by whom, when.

What to put in it

  • List this week's rooms and outlets unused for 7+ days (from your occupancy sheet)
  • In each room: run the hot and cold taps and the shower for several minutes, until the temperature settles at the supply's, letting it run to drain
  • Flush the toilet
  • Tick each room off as done, noting the room number
  • Any outlet that won't run clear or won't shut off → task or call-out in two taps
  • Record the full list of rooms covered this week

Who and how often — weekly; housekeeping or maintenance.

Why it matters — still water is where legionella grows, and the log proves the quiet wing wasn't quietly forgotten.

Back to the chart ↑

Book in the quarterly showerhead descale

What’s expected — Official guidance (HSG274 Part 2) recommends dismantling, cleaning and descaling showerheads and hoses every quarter. The duty to control legionella is law; the quarterly frequency is guidance, tuned by your risk assessment. Sources: legislation.gov.uk, COSHH Regulations 2002, regulation 7 · HSE, HSG274 Part 2.

Set it up in Angel Hub

  1. Open Checklists → New checklist template.
  2. Name it Quarterly showerhead clean & descale and change the frequency to quarterly.
  3. Add the items below and assign it to maintenance or housekeeping.

From now on it appears every quarter by itself, and the log shows which rooms were done and when — no January panic over whether autumn happened.

What to put in it

  • Work through rooms in a set order (note where this quarter starts)
  • Remove each showerhead and hose
  • Clean and descale both
  • Inspect condition — anything worn or perished → replacement task in two taps
  • Refit and run the shower through
  • Record the rooms completed this quarter

Who and how often — quarterly; maintenance or housekeeping.

Why it matters — the descale log shows an environmental health officer the routine is real and regular, not a once-a-year scramble.

Back to the chart ↑

Run the spa pool by the book

What’s expected — Official guidance (HSG282) recommends this routine for a commercial-type spa pool: water clarity, pH and disinfectant checked at opening and then every two hours (chlorine 3–5 mg/l or bromine 4–6 mg/l), with the waterline cleaned at close; a weekly inspection and clean of accessible pipework and jets; monthly microbiological testing; quarterly legionella sampling; draining, cleaning and refilling the whole system daily to weekly, as your risk assessment sets; and, as a minimum, a full water change whenever bathers since the last change reach 100 × the pool's capacity in m³. A hot tub kept for one room's guests (HSE calls it domestic-type) has its own column in HSG282: clarity, pH and disinfectant checked at least twice a day, depending on your risk assessment and use; drained, cleaned and refilled between each group of guests or at least weekly, whichever comes first; and the same monthly microbiological and quarterly legionella tests. A hot tub shared by several rooms should be run as a commercial-type pool. The law requires the risk to be controlled; the frequencies are guidance. Sources: legislation.gov.uk, Health and Safety at Work etc. Act 1974, section 3 · HSE, HSG282.

Set it up in Angel Hub

  1. Open Checklists → New checklist template, name it Spa pool — daily regime, and set the frequency to daily.
  2. Create a second template, Spa pool — weekly jets & pipework clean, on the weekly default.
  3. Open Compliance → Add record for the monthly microbiological tests and the quarterly legionella samples, results attached, via your contractor in Contractors.

From now on the daily readings log themselves with who and when, the weekly clean can't be skipped invisibly, and the sampling results build into a record an inspector can read in one sitting.

What to put in it

The daily checklist:

  • Opening: water clarity, disinfectant reading (chlorine 3–5 mg/l / bromine 4–6 mg/l), pH — record all three
  • Re-check readings every two hours — record each round
  • Track bather numbers toward the water-change point
  • Close: clean the waterline
  • Any reading out of range → act, and raise a task in two taps

Who and how often — daily by the on-shift team; weekly clean; monthly and quarterly testing via your contractor.

Why it matters — the pool log shows an environmental health officer the routine is real, and a reading out of range at 10am is a correction, not a closure.

Back to the chart ↑

Stay on top of your private water supply

What’s expected — If you're not on mains water (boreholes, springs — country-house territory), the law puts the local authority in charge: they risk-assess your supply at least every five years and monitor it with regular sampling — one to four Group A samples a year by volume, plus the wider Group B tests once a year (twice above 10 m³ a day); after three years of good results the council may test some things less often or stop, but never E. coli. They can charge you for this. Your duties are to cooperate and to fix what they find — and if your supply is disinfected, the law requires you to keep that treatment working and to check that it does. Mains water can count too: if you pass it on through your own pipes to premises whose occupiers aren't the water company's customers (let lodges or cottages, or staff houses), the council may treat it as a private supply and sample it as its risk assessment sets. The council decides, so ask them. Sources: legislation.gov.uk, Private Water Supplies (England) Regulations 2016, regulation 6 · legislation.gov.uk, Private Water Supplies (England) Regulations 2016, regulation 5 · legislation.gov.uk, Private Water Supplies (England) Regulations 2016, schedule 2 · legislation.gov.uk, Private Water Supplies (England) Regulations 2016, schedule 5 · DWI, regulation 8 questions and answers.

Set it up in Angel Hub

  1. Open Compliance → Add record for the local authority's risk assessment, with its five-year review date.
  2. Add a record per sampling visit, results attached.
  3. Any remedial the LA requires → a task with an owner and deadline.

From now on every visit, result and fix is on record — one continuous history instead of letters in a drawer.

What to put in it

  • The LA risk assessment: date, findings, five-year review date
  • Each sampling visit: date, parameters, result letters attached
  • Remedial works: what, who, done when

Who and how often — LA-led: five-yearly risk assessment, sampling by volume (by risk, for mains water you pass on); your part is access, records, remedies and keeping any disinfection working.

Why it matters — a failed sample with no paper trail of fixes is how a country hotel ends up on a boil-water notice; the history shows you acted every time.

Back to the chart ↑

Tap water: know what's not your job

What’s expected — If you're on mains water (the norm), the law makes the water company supply wholesome water up to where it leaves its pipes, and the company tests the public supply — there is no routine tap-water test for you to buy, whatever a salesman says. Water that spoils only after it leaves the company's pipes generally isn't counted as the company's failure, and the company can require you to put your plumbing right. Your legal duties are system-side: don't let pipes and fittings fall into disrepair so that they could contaminate or waste water or let it flow back into the main, and keep backflow prevention in place. Fittings lawfully installed before July 1999 needn't be replaced, but new work must meet the 1999 Water Fittings Regulations, and extending or altering a hotel's water system needs notice to the water company first, unless an approved contractor does the work. If you serve food or drink, food hygiene law also requires potable water, including for ice. Legionella control has its own guides, and if you pass mains water on through your own pipes to other properties, see the private water supply guide. Sources: legislation.gov.uk, Water Industry Act 1991, section 68 · legislation.gov.uk, Water Industry Act 1991, section 73 · legislation.gov.uk, Water Supply (Water Fittings) Regulations 1999, regulation 3 · legislation.gov.uk, Water Supply (Water Fittings) Regulations 1999, regulation 5 · legislation.gov.uk, Regulation 852/2004, Annex II chapter VII.

Set it up in Angel Hub

  1. Nothing — there's genuinely nothing to schedule for tap-water quality on a mains supply, and this page exists to say so.
  2. Make sure your legionella routine is running — that's the system-side duty that's real: the register, monthly temperatures, weekly flushing.
  3. When plumbing work happens, have the contractor confirm fittings compliance and keep that note with the job's call-out.

From now on: nothing extra appears on any clock — which is exactly right.

What to put in it

Nothing. If someone offers you a "tap water testing service" for a mains-fed hotel, the polite answer is that the water company already tests the supply.

Who and how often — nobody, routinely; that's the point.

Why it matters — an honest chart never oversells: knowing what's not required is worth as much as knowing what is.

Back to the chart ↑

Electrical2 guides

Plan your fixed-wiring test before it plans you

What’s expected — The law says keep your electrical installation safe — a continuing duty with no fixed testing interval. IET guidance gives five years as the longest gap between inspections for a hotel and one year for a swimming pool, and each report recommends when the next one is due, which can be sooner. Check your premises licence too: a condition on it can set an inspection date you must meet. If staff live in as their main home and pay rent for their room, the law sets a timetable for those rooms: inspected and tested before the first person moves in, then at least every five years, or sooner if the last report says so, with a copy of the latest report given to each new occupant before they move in. That rule doesn't cover staff who share a kitchen, bathroom or living room with the owner or the owner's family, or who live in a caravan, mobile home or boat. Sources: legislation.gov.uk, Electricity at Work Regulations 1989, regulation 4 · legislation.gov.uk, Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 3 · IET, inspection and testing FAQs · IET Wiring Matters, intervals from Guidance Note 3.

Set it up in Angel Hub

  1. Open Compliance → Add record for the EICR: report attached, next one due within five years.
  2. Add a separate shorter-cycle record for a swimming pool, or any area your electrician puts on a shorter cycle — and one for rooms you let to staff as their home.
  3. Anything the report flags → tasks or call-outs with owners.

From now on the five-year clock runs itself, the shorter cycles run their own, and remedials become jobs instead of appendix items.

What to put in it

  • Inspection date, contractor, and the report file
  • Next due date (five years or your shorter cycle)
  • Items the report flagged, each as a task
  • Which areas are on the shorter cycle, and why

Who and how often — at most five-yearly for hotels and yearly for swimming pools, or sooner if your last report says so (guidance); for rooms you let to staff as their home, five-yearly or sooner (law); competent electrical contractor.

Why it matters — insurers and inspectors ask for the current EICR, and a lapsed one tends to surface at the worst possible moment: during a claim.

Back to the chart ↑

Right-size your PAT testing — annual isn't the law

What’s expected — The law says keep electrical equipment safe. HSE says explicitly that portable appliance testing is not a legal requirement, and not legally annual — a myth HSE itself calls out. Official guidance is a risk-based regime: user checks, formal visual inspections, and combined tests at intervals set by equipment type and use. For earthed (Class I) kit such as kettles and some floor cleaners, HSE suggests starting with a visual inspection every six to twelve months and a test every one to two years, at the shorter end where use is demanding — HSE names kitchens and laundries as a hotel's high-risk areas. Double-insulated (Class II) kit needs no routine test: hand-held kit gets user checks and a visual inspection every six to twelve months, kit that is rarely moved a visual inspection every two to four years, and a test is still likely to be justified after a repair. Kit your guests use, such as room kettles and hairdryers, may need visual checks much more often, because you don't control how it's used. Sources: HSE, PAT FAQ · HSE, HSG107 maintaining portable electrical equipment.

Set it up in Angel Hub

  1. Open Assets → Add asset for your appliances (or import your PAT contractor's list), grouped by type and use.
  2. Give each group the schedule your risk actually calls for — kitchen kit on a tight cycle, the office printer on a relaxed one.
  3. A failed item → out of service and a task, in two taps.

From now on every appliance shows its test status and next due date, and you're paying for the testing your risk needs — not the myth.

What to put in it

  • Each appliance: what and where, type and use
  • Last test date and result
  • Next due, on your own risk-based schedule
  • The habit that matters most: staff report damaged leads and plugs as tasks the moment they see them

Who and how often — maintain to prevent danger (law, no fixed interval); HSE's starting point for earthed kit is a visual inspection every 6–12 months and a test every 1–2 years, at the shorter end in kitchens and laundries (guidance), adjusted as results come in.

Why it matters — the register proves your regime is deliberate rather than absent — which is exactly what an inspector wants to see, and cheaper than blanket-testing everything every year.

Back to the chart ↑

Food safety4 guides

Keep daily kitchen checks running themselves

What’s expected — The law requires a documented, HACCP-based food safety management system that runs all the time: you monitor the points it marks as critical, check regularly that it works, keep records that suit the size of your business, and review it whenever a dish, a process or any step changes. In England, food that needs chilling to stay safe must be kept at 8°C or below, and cooked or reheated food kept hot for service or display at 63°C or above; the law excuses one spell on display of under four hours cold or under two hours hot, never repeated, and a short, unavoidable spell above 8°C (during preparation, a fridge's defrost cycle or a breakdown) if it is consistent with food safety. The law sets no checking interval: the FSA's Safer Food, Better Business pack — with its daily diary of opening and closing checks — is the accepted route for small caterers, and says to check fridges at least once a day. Sources: legislation.gov.uk, Regulation 852/2004, article 5 · legislation.gov.uk, Food Safety and Hygiene (England) Regulations 2013, schedule 4 · gov.uk, Safer Food Better Business for caterers.

Set it up in Angel Hub

  1. Open Checklists → New checklist template, name it Kitchen opening checks, and set the frequency to daily.
  2. Create Kitchen closing checks the same way.
  3. Add the items below; assign both to the kitchen team.
  4. Keep your food safety management system in Knowledge Base — create it with New document, so it lives where the team already looks things up.

From now on both checklists appear every day by themselves, every fridge reading is logged with who and when, and the diary an inspector may ask to see has been writing itself.

What to put in it

Opening:

  • Every fridge and freezer within range (chilled at 8°C or below in England) — record each reading
  • Probe calibration check
  • Staff fit for work, kitchen clean from close

Closing:

  • Fridge and freezer readings again — record
  • Hot holding through service was at 63°C or above
  • Cleaning done; issues → tasks in two taps
  • Anything unusual noted for the diary

Who and how often — daily; the kitchen team on opening and closing shifts.

Why it matters — an inspector may want to look at your diary pages, and a fridge reading 9°C at 8am is stock moved and a call-out raised — not a quiet loss discovered at lunch.

Back to the chart ↑

Register your food business — once, then keep it current

What’s expected — The law requires every food business to register each site with its local authority and to keep its details up to date, including telling it of any significant change in what you do or a closure; the Food Standards Agency says you must register at least 28 days before you start trading. It's free and can't be refused, and a new operator or new premises needs a new registration. Sources: legislation.gov.uk, Regulation 852/2004, article 6 · gov.uk, food business registration · gov.uk, starting a food business.

Set it up in Angel Hub

  1. Open Compliance → Add record: your registration, with the authority, date, and confirmation attached.
  2. Note the change triggers on the record: new operator or new premises means a new registration, not an edit.

From now on the proof is one tap away when the EHO asks, and whoever takes over the business one day inherits the warning that they must re-register.

What to put in it

  • Local authority and registration date
  • The confirmation, attached
  • The triggers: change of operator → new registration; change of premises → new registration; other details → keep the LA updated

Who and how often — once per premises, before trading; again on any change of operator or premises.

Why it matters — trading without registering breaks the law, and a new owner must register afresh rather than carry on under the old owner's registration.

Back to the chart ↑

Keep your hygiene rating on record — and know the display rules

What’s expected — In England, displaying your rating sticker is voluntary and encouraged, not required. If you have heard flatly that display is the law, that is Wales and Northern Ireland, where it is — one of the clearest places this page's England-only scope matters. Watch this space: in September 2026 the Food Standards Agency's board backed plans that include making display compulsory in shops and restaurants in England, and online across the UK. A public consultation is due later in 2027, ministers make the final decision, and there is no start date yet. Sources: gov.uk, FHRS guidance for businesses · gov.uk, FSA news, 16 September 2026.

Set it up in Angel Hub

  1. Open Compliance → Add record: your current rating and inspection date.
  2. If you're chasing a better score, track the reinspection request on the same record.

From now on the rating, its date and the paperwork live in one place — ready for the next inspection or a franchise audit.

What to put in it

  • Current rating and inspection date
  • Where the sticker is displayed (voluntary in England, but good practice)
  • Reinspection request, if in flight

Who and how often — updated at each inspection.

Why it matters — the rating is public either way; knowing your date and having the evidence organised is what improves the next one.

Back to the chart ↑

Keep allergen information ready before anyone asks

What’s expected — The law requires food you pack on site before anyone orders or picks it (grab-and-go sandwiches, minibar items you pack) to carry its name and a full ingredients list with any of the 14 allergens emphasised (Natasha's Law); food packed after the guest orders it follows the rules for loose food. For loose and made-to-order food, allergen information must be provided, written or spoken; if it is spoken, a label, menu or notice that customers can see where they choose must tell them to ask staff. The information must be accurate at all times, so it changes when a dish does. FSA best practice since February 2025, which is not law: written allergen information customers can see, where possible, without having to ask, backed by a conversation with staff. Sources: legislation.gov.uk, Food Information Regulations 2014, regulation 5A · legislation.gov.uk, Food Information Regulations 2014, regulation 6A · legislation.gov.uk, Food Information Regulations 2014, regulation 5 · legislation.gov.uk, Regulation 1169/2011, article 44 · gov.uk, allergen labelling for PPDS food · gov.uk, allergen information for non-prepacked foods: best practice.

Set it up in Angel Hub

  1. Open Knowledge Base → New document and start from the Allergen & food info sheet template, one sheet per dish: the dish, who prepares it, the ingredients, a photo, and the allergens it contains picked from the 14 statutory allergens as one-tap labels — they come ready-made, so nobody types "sulphites" twice.
  2. In Inventory, tap the allergens each food item you buy contains — the same 14 — so a new supplier's ingredient list has somewhere to live.
  3. Make "review the allergen sheets" a standing task on every menu change, so the sheets can never trail the menu.
  4. Record allergen training per staff member in Training — the Training records view shows who's current and who's due.

From now on every dish's sheet is one tap away at the pass, it moves when the menu moves, and training gaps are visible before they matter.

What to put in it

  • One sheet per dish: ingredients, the allergens it contains from the 14, who prepares it
  • Who last updated it, and when — the document shows this itself
  • The allergens on every food item you buy, tagged in Inventory
  • A labelling check for anything packed on site before it's ordered (PPDS): the food's name, full ingredients, allergens emphasised
  • Training records for everyone who takes an order or plates a dish

Who and how often — kept accurate at all times, so updated whenever a dish changes, and checked daily (guidance); all food-facing staff trained.

Why it matters — when a guest asks "is there nut in this?", the answer comes from the dish's own sheet — not from memory, and never from a guess.

Back to the chart ↑

Health & safety, people6 guides

Sort your health & safety risk assessments

What’s expected — The law requires suitable and sufficient risk assessments of your work activities — written down if you employ five or more people — reviewed when they're no longer valid or after significant change. The law sets no review interval; a yearly check is a sensible habit. With five or more staff the law also requires a written health & safety policy, revised as often as appropriate and brought to every employee's attention; and every employer, whatever their size, must display the H&S law poster or give each worker the equivalent leaflet. Sources: legislation.gov.uk, Management of Health and Safety at Work Regulations 1999, regulation 3 · legislation.gov.uk, Health and Safety at Work etc. Act 1974, section 2 · legislation.gov.uk, Health and Safety Information for Employees Regulations 1989, regulation 4 · HSE, prepare a health and safety policy.

Set it up in Angel Hub

  1. Open Safety → New document for each assessment — start with your biggest everyday risks and add from there.
  2. Give each one a review cycle and the manager's sign-off.
  3. File the written H&S policy as its own Safety document, signed.
  4. Turn every "further action" into a task with an owner and a date.

From now on every assessment lives with its review date and sign-off, overdue reviews are visible at a glance, and new starters can be shown exactly where everything is.

What to put in it

Each assessment's sections:

  • The activity or area being assessed
  • Who could be harmed, and how
  • What you already do to control the risk
  • What more needs doing — each item straight into a task
  • Who assessed it, and when
  • Review date, and what would trigger an early one

A practical starter set for a hotel: manual handling, slips and trips, kitchen work, cleaning chemicals (see the COSHH guide), lone working, and maintenance work.

Who and how often — the manager responsible; review after any significant change, with a yearly check as a sensible habit.

Why it matters — written assessments are what an inspector will ask to see, and the five-or-more rule catches nearly every hotel.

Back to the chart ↑

Never let your liability certificate lapse

What’s expected — The law requires employers' liability insurance of at least £5m per occurrence from an authorised insurer, with the certificate displayed at each place where you employ staff, where they can easily see it (electronic is fine if accessible), and produced to inspectors on demand. Being uninsured risks up to £2,500 per day. Sources: HSE, HSE40 · legislation.gov.uk, Employers' Liability (Compulsory Insurance) (Amendment) Regulations 2008.

Set it up in Angel Hub

  1. Open Compliance → Add record: the policy, certificate attached, renewal date set.
  2. Note on the record where the certificate is displayed for staff.

From now on the renewal counts down in plain sight, and the certificate is one tap away when an inspector asks.

What to put in it

  • Insurer, policy number, cover amount (at least £5m)
  • The certificate, attached
  • Renewal date
  • Where staff can see it

Who and how often — cover must be in force every day you employ staff; renew before the policy ends and display the new certificate.

Why it matters — at up to £2,500 a day uninsured, this is the cheapest reminder you will ever set.

Back to the chart ↑

Log every incident — and know when RIDDOR applies

What’s expected — The law requires certain work-related incidents to be reported to HSE. Deaths; specified injuries to workers; guests and other non-workers taken straight from the scene to hospital for treatment; and dangerous occurrences: notify without delay and send the full report within 10 days. An injury that keeps a worker off work, or unable to do their normal duties, for more than seven days in a row (not counting the day it happened, but counting weekends and days off): report within 15 days of the accident. Listed occupational diseases: report as soon as you receive the diagnosis. Self-employed contractors hurt on your premises count too: as the person in control of the premises, you report them. One relief: for dangerous gas fittings, the reporting duty sits with the Gas Safe engineer, not with you — though if a fitting injures someone, that injury can still be yours to report. Sources: HSE, when to report · HSE, types of reportable incidents · HSE, who should report · legislation.gov.uk, RIDDOR 2013, regulation 11.

Set it up in Angel Hub

  1. Open Safety and use incident reporting to log every accident and near-miss as it happens — from a phone, by anyone with the Report accidents & near-misses permission (the ready-made front-line roles carry it; add it to any other role).
  2. Tick the RIDDOR flag on anything that may be reportable — the record then stands out from the routine entries.
  3. Make the report to HSE within the deadline for its type, and note on the incident record the date you reported, how you reported, and HSE's reference.
  4. Turn what the incident revealed into tasks — the broken step gets fixed, not just written up.

From now on there's one incident log for the whole site, every entry stamped with who and when, and the RIDDOR-flagged ones impossible to lose among the paper cuts.

What to put in it

Each incident record:

  • What happened, when and where
  • Who was involved — worker or guest — and the injury
  • Witnesses
  • What was done immediately
  • The RIDDOR flag if it's a death, a specified injury, an over-7-day injury (off work or off normal duties), a guest or visitor taken from the scene to hospital for treatment, or a dangerous occurrence
  • Follow-up actions, each as a task with an owner

Who and how often — anyone logs, immediately; the duty manager reviews the same day. Deadlines: without delay, 10 days, or 15 days, by type.

Why it matters — if HSE or your insurer ever asks, the log is your timeline; and every near-miss you record is a hazard fixed for free.

Back to the chart ↑

Keep first aid stocked, staffed and in date

What’s expected — The law requires "adequate and appropriate" first-aid equipment, facilities and people for your staff — anyone you provide as a first-aider must be suitably trained — and you must tell staff what the arrangements are. Everything else is official guidance: base your provision on a needs assessment and include guests in it, stock kits to match that assessment (a kit made to the British Standard, BS 8599-1, is one way to do it, not a legal requirement), check kits frequently and restock after use, and renew first-aiders' certificates before they expire — they last three years — with an annual refresher strongly recommended. Sources: legislation.gov.uk, Health and Safety (First-Aid) Regulations 1981, regulation 3 · legislation.gov.uk, Health and Safety (First-Aid) Regulations 1981, regulation 4 · HSE, L74 first aid at work · HSE, first aid FAQs.

Set it up in Angel Hub

  1. Open Safety → New document and file your first-aid needs assessment — how many first-aiders and kits your site needs, and why.
  2. Open Checklists → New checklist template, name it Monthly first-aid kit check, and change the frequency to monthly.
  3. In Training, create the first-aid course with New course and record each first-aider's certificate — the Training records view shows everyone as Valid until, Due soon or Expired.

From now on the kit check appears every month by itself, and an expiring certificate shows as Due soon long before it lapses.

What to put in it

The monthly kit check:

  • Check each kit's contents against your needs assessment (or the BS 8599-1 list, if you use those kits)
  • Replace anything used or out of date
  • Kit locations signed, and known to the team on shift
  • Eyewash and any extras from your needs assessment present
  • Anything missing → task in two taps
  • Record which kits were checked

And in Training: who your first-aiders are, which course they hold, and each certificate's renewal date.

Who and how often — a monthly kit check by the duty manager is a sensible routine; certificates renewed every three years per first-aider, with an annual refresher strongly recommended.

Why it matters — an empty kit is only ever discovered when someone's bleeding, and a lapsed certificate is invisible until the day it matters.

Back to the chart ↑

Get COSHH sorted for your cleaning and kitchen chemicals

What’s expected — The law requires an assessment before staff work with hazardous substances — housekeeping and kitchen chemicals squarely count — recorded if you employ five or more people, and reviewed regularly and immediately if it's no longer valid. Informing and training your staff is a legal duty too. The law sets no fixed review interval; a yearly check is a sensible habit. Sources: legislation.gov.uk, COSHH Regulations 2002, regulation 6 · legislation.gov.uk, COSHH Regulations 2002, regulation 12 · HSE, COSHH assessment · HSE, CAIS22 cleaning chemicals in hospitality.

Set it up in Angel Hub

  1. Open Safety → New document for each chemical or product group — COSHH assessments are a built-in document type.
  2. Work from the supplier's safety data sheet: put its key hazards and first-aid steps into the assessment.
  3. Set the review cycle and the manager's sign-off.
  4. Record chemical-handling training per staff member in Training, so renewals surface as "Due soon".

From now on every substance in the cupboard has a signed assessment with a review date, and training gaps show themselves before an inspector asks.

What to put in it

Each assessment's sections:

  • Product and supplier
  • The hazard (what the data sheet says)
  • Who's exposed, and how (dilution, spraying, soaking)
  • Controls: dilution rates, gloves and PPE, ventilation, storage
  • What to do on a spill or splash — first-aid steps from the data sheet
  • Training needed before use
  • Assessor, date, review date

Who and how often — head housekeeper and head chef with the manager; review regularly (a yearly check is a sensible habit) and immediately when a product changes.

Why it matters — when someone splashes oven cleaner at 9pm, the assessment is what shows staff knew the controls and the first-aid steps before it happened.

Back to the chart ↑

Keep an accident book that respects privacy

What’s expected — Where ten or more people are normally employed at the same time at your premises, the law requires an accident book in the approved form — on paper, such as HSE's Accident Book (BI 510), or electronically — that staff can easily get to and record their own injuries in, with every entry kept at least three years from the date it was made. Whatever your size, the law (RIDDOR) also requires a record of every reportable incident and diagnosis, and of any work injury that keeps a worker off their normal duties for more than three days in a row (not counting the day it happened, but counting weekends and days off), kept for at least three years. Data-protection law requires completed entries to be kept secure, so one person's details aren't visible to the next person who opens the book. Recording every accident is good practice. Sources: legislation.gov.uk, Social Security (Claims and Payments) Regulations 1979, regulation 25 · legislation.gov.uk, RIDDOR 2013, regulation 12 · legislation.gov.uk, UK GDPR, Article 5 · HSE, report accidents and keep records.

Set it up in Angel Hub

  1. Use Safety incident reporting as your accident book. HSE says you can record accidents in your own record system rather than its book, so make sure each entry holds the details listed below, and give every member of staff the Report accidents & near-misses permission so they can record their own injury (the ready-made front-line roles carry it). Each entry is private by design: staff see only their own reports, managers see them all.
  2. Log every accident as it happens; add the RIDDOR flag when it may be reportable (see the RIDDOR guide).

From now on every entry is stamped with who and when, kept for the three-year retention, and nobody flips through other people's injuries to write up their own.

What to put in it

Each entry:

  • Who was hurt: full name, address and occupation (the report has no box for address or occupation, so add them under What happened?)
  • What happened, when and where, and the cause and nature of the injury
  • If someone else makes the entry: their name, address and occupation
  • What was done
  • The RIDDOR flag where it applies
  • Follow-up → tasks

Who and how often — every accident, logged as it happens, by anyone on shift.

Why it matters — an old-style bound accident book shows every past entry to every new reader, which is a data-protection problem; a digital log keeps each entry private from the start, and one record can serve both laws for injuries if it holds both sets of details.

Back to the chart ↑

Premises admin & licences5 guides

Keep waste paperwork inspection-ready

What’s expected — The law requires you to hand waste only to an authorised person, such as a registered waste carrier or the council, with a waste transfer note kept for at least two years; one note can cover a regular series of the same non-hazardous waste with the same carrier, which the official code limits to a year. Hazardous waste travels on a consignment note instead, kept for three years. And since 31 March 2025, businesses in England that had ten or more full-time-equivalent employees on that date, counted across all their sites, must separate dry recyclables, food waste (however little) and general waste; smaller firms must do the same from 31 March 2027. Sources: legislation.gov.uk, Environmental Protection Act 1990, section 34 · legislation.gov.uk, Waste (England and Wales) Regulations 2011, regulation 35 · gov.uk, Waste duty of care code of practice · legislation.gov.uk, Hazardous Waste (England and Wales) Regulations 2005, regulation 49 · legislation.gov.uk, Separation of Waste (England) Regulations 2025, regulation 4 · gov.uk, Simpler Recycling.

Set it up in Angel Hub

  1. Open Compliance → Add record for each waste carrier: registration checked, with a periodic re-check date.
  2. Keep transfer notes attached to a record so the two-year retention takes care of itself.
  3. Open Checklists → New checklist template for a segregation spot-check (monthly works well) — are the right things in the right bins?

From now on the paperwork an inspector asks for is one tap away, and the bins get a regular audited glance instead of wishful thinking.

What to put in it

  • Each carrier: registration number, checked when, next check
  • Transfer notes, attached as they arrive
  • The spot-check: recycling uncontaminated, food waste separated, general waste only what's left; problems → task in two taps

Who and how often — a transfer note for each collection, or one note for a regular series of the same non-hazardous waste (the official code says up to a year); carrier checks periodically; spot-checks on your own rhythm (monthly works well).

Why it matters — waste that ends up fly-tipped traces back to you, and the transfer notes are what show it left your site lawfully.

Back to the chart ↑

Renew your ICO fee without thinking about it

What’s expected — The law requires almost every hotel to pay the annual ICO data-protection fee — CCTV for crime prevention removes the common exemptions. Tiers: £52 (turnover up to £632k or up to 10 staff), £78, or £3,763 for the largest. You also need privacy notices and a lawful basis for what you hold, and you must tell people where CCTV is recording; the ICO says prominent signs are an effective way to do it. Since 19 June 2026 a privacy notice must also tell people they have the right to complain to you. Sources: ICO, data protection fee · ICO, data protection fee FAQs · legislation.gov.uk, UK GDPR, Article 6 · legislation.gov.uk, UK GDPR, Article 13 · ICO, video surveillance guidance.

Set it up in Angel Hub

  1. Open Compliance → Add record: the ICO fee, your tier noted, renewal date set.
  2. Add "CCTV signage present and legible" to an existing monthly walk-round checklist.

From now on the fee renews on a visible clock, and the signage gets checked with everything else.

What to put in it

  • Registration reference and tier (with why — turnover or headcount)
  • Renewal date
  • Where your privacy notice lives; where CCTV signs are posted

Who and how often — the fee every year; privacy notices and CCTV signs kept in place and up to date.

Why it matters — the fee is small and the register of who's paid is public, so a missed renewal is easy to spot — and easy to avoid.

Back to the chart ↑

Protect your premises licence

What’s expected — The law: the annual fee (£70–£350 by band, doubled in band D and trebled in band E where the premises are used mainly for drinking on the premises) is due on the grant anniversary, and non-payment suspends the licence. You need a designated premises supervisor holding a personal licence, every sale authorised by a personal licence holder, and the mandatory conditions met: an age-verification policy, free tap water on request, smaller measures offered and customers made aware, no irresponsible promotions, and no alcohol sold below the cost of duty plus VAT — with the licence summary displayed. Official guidance encourages a higher age than 18 for ID checks, such as Challenge 21 or Challenge 25. Sources: gov.uk, alcohol licensing · legislation.gov.uk, Licensing Act 2003, section 55A · gov.uk, alcohol licensing fee levels · gov.uk, section 182 guidance, September 2026.

Set it up in Angel Hub

  1. Open Compliance → Add record: the annual fee, due on your grant anniversary — the single highest-value reminder in the module, because missing it suspends the licence.
  2. Add a record per personal licence holder, including the DPS.
  3. Record age-verification training per staff member in Training.

From now on the anniversary can't slip past, every personal licence is on file, and the bar team's training is visible.

What to put in it

  • The premises licence: grant anniversary, fee band, licence summary displayed where
  • Each personal licence: holder, number, the DPS marked
  • The mandatory conditions as your bar's standing rules: age-verification policy (many bars use Challenge 21 or 25), free tap water on request, smaller measures offered and advertised, no irresponsible promotions, no sales below the cost of duty plus VAT
  • Age-verification training records in Training

Who and how often — fee annually on the grant anniversary; licences per person; training for everyone who serves.

Why it matters — a missed annual fee legally stops all alcohol sales the day the licence suspends; few reminders pay for themselves faster.

Back to the chart ↑

Keep the music licensed

What’s expected — Playing recorded or live music, radio or TV audibly anywhere on site — bar, restaurant, lobby, staff areas, and hotel bedrooms by tariff — needs the copyright owners' permission under copyright law; usually that means TheMusicLicence (PPL PRS), which renews each year. No music at all, including none through radio or TV, means no music licence is needed. Sources: legislation.gov.uk, Copyright, Designs and Patents Act 1988, section 19 · PPL PRS, TheMusicLicence · PPL PRS, hotels and guesthouses · PPL PRS, help.

Set it up in Angel Hub

  1. Open Compliance → Add record: the licence, what's covered noted, renewal date set.

From now on the renewal counts down, and the answer to "are we covered for the lobby?" is on the record, not in someone's memory.

What to put in it

  • Licence reference and renewal date
  • Which areas and uses it covers (bar, restaurant, lobby, staff areas, bedrooms if applicable)

Who and how often — the licence renews each year; it must be in place whenever music plays.

Why it matters — if PPL PRS ask whether you're covered, the record answers in one tap instead of a scramble through old emails.

Back to the chart ↑

Get bar measures right

What’s expected — The law fixes bar measures: gin, rum, vodka and whisky in 25ml or 35ml (or multiples) — one standard per premises, with a notice stating which; still wine by the glass in 125ml or 175ml, and port, sherry and other fortified wine in 50ml or 70ml (both in multiples too), and wine by the open carafe in 25cl, 50cl, 75cl or 1 litre, with the sizes shown on a notice or on every wine list and menu; draught beer and cider in ⅓, ½ or ⅔ pint and multiples of a half. Any measure, meter or glass used to measure them must carry a stamp, or on newer glasses and thimbles a CE or UKCA mark. Sources: legislation.gov.uk, Weights and Measures (Intoxicating Liquor) Order 1988 · gov.uk, specified quantities · Business Companion (trading standards), selling alcohol in licensed premises.

Set it up in Angel Hub

  1. Write the bar SOP — your chosen spirit standard, the wine and beer measures, and the required notice — and keep it in Knowledge Base (New document), where the bar team can find it.
  2. Open Compliance → Add record for your measuring equipment's verification (stamped, or CE/UKCA-marked), so there's a dated answer when trading standards visit.
  3. Add a measures item to an existing bar checklist: notice displayed, correct measures in use, equipment stamped or marked.

From now on new bar staff learn the house standard from the SOP, and the equipment's status is on record.

What to put in it

  • The house spirit standard: 25ml or 35ml — one, stated on the notice
  • Wine: 125ml/175ml and multiples; carafes: 25cl, 50cl, 75cl, 1 litre; fortified: 50ml/70ml and multiples; draught: ⅓, ½, ⅔ pint + halves
  • Where the notices are displayed (the wine sizes can be on every wine list and menu instead)
  • Equipment verification: what, checked when

Who and how often — standing; equipment verification kept on record.

Why it matters — trading standards check the measures, the notices and the stamps on a routine visit; the record turns that visit into a formality.

Back to the chart ↑

A few useful answers

Clear about what Angel Hub does.

Software helps your team organise the work and keep the records. People still carry out the checks and make the decisions.

Does Angel Hub make us compliant?
It helps you manage checks, documents, dates and follow-up work. Your team still needs to carry out the work, keep records accurate and act on problems. It does not replace a competent assessment or guarantee an inspection result.
Can we use it outside England?
Angel Hub helps UK hospitality teams organise their operations. The legal reference library on this page is written for England. If you operate elsewhere in the UK, set up your routines around the requirements and regulator guidance that apply to your business.
Can we keep our existing documents?
Yes. Save certificates with Compliance records, keep risk assessments and policies in Safety, and share everyday instructions in Knowledge Base. You decide which documents to add and keep them up to date.

Book a demo

Make your next inspection less of a scramble.

Tell us which checks, records or follow-ups take the most chasing. We’ll show you how your team could manage them together in Angel Hub.

Or write to us: info@angelhub.co.uk

General guidance for hospitality businesses in England, with sources — not legal advice. Verify against the cited source and your own risk assessments.